The pre-shipment period, in export credit insurance and finance, is the time from the date a contract is signed, or an order accepted, until the goods are shipped or, for some contracts, accepted by the buyer. During this period the exporter is designing, building or buying in the goods and incurring costs. If the buyer cancels, becomes insolvent or is prevented from going ahead by political events, the exporter may be left with partly finished goods that cannot easily be sold elsewhere. This exposure is called manufacturing risk.
The length of the pre-shipment period matters most for custom-built capital goods and projects, where it can run to months or years. Insurers and export credit agencies price manufacturing risk cover partly by reference to this period, and the exporter often needs pre-shipment finance to cover its costs. Once the goods are shipped, the exposure becomes post-shipment risk.
Ref 1170000257