Lease-Up Risk

Banking and Financial InstitutionsUpdated 17 Nov 2026

Lease-up risk is the risk that a newly built, refurbished or largely vacant property will take longer to reach target occupancy than planned, or will need lower rents, larger incentives or more tenant improvement allowances to get there. Until it is leased, the building produces too little net operating income to cover costs and debt service.

Lease-up risk sits between construction risk and stabilised operating risk. Developers and lenders manage it through pre-leasing requirements, interest and operating reserves, conservative absorption assumptions, sponsor guarantees and loan terms that allow time to reach stabilisation. A slow lease-up delays the point at which a bridge loan or construction loan can be refinanced on permanent terms and raises refinance risk. Valuers reflect it by deducting expected lease-up costs from the value based on stabilised net operating income.